Blacksburg Transit Facility Rooftop Solar
Solar power purchase agreement under which a solar array is being installed on the Blacksburg Transit facility roof and the Town buys the electricity. Town Council adopted Ordinance 2102 authorizing the agreement with TB Solar, LLC unanimously on December 9, 2025, with an initial 25-year term and options to extend to 35 years. On September 25, 2026 the Town announced that Baseline Solar would install 1,469 panels (866.71 kilowatts) under its agreement with Secure Solar Futures, with construction scheduled to finish by the end of 2026. On October 13, 2026 the Town Attorney told Council the project was about halfway done.
The project
The details.
Town staff told Council at a November 18, 2025 work session that the agreement covers rates, maintenance and decommissioning and is structured to ensure uninterrupted transit operations. The Town says the system is being built at no upfront cost to the Town, will supply about 90 percent of the building's energy, including charging for up to 50 electric buses, and will save about $2.2 million in electricity costs over the 25-year term at a fixed rate. Ordinance 2121, a utility easement to Appalachian Power over the transit property for the installation (including a new pole for AEP equipment), was introduced September 8, 2026 and went to public hearing October 13, 2026.
- Status
- Under construction
- Type
- Infrastructure
- Jurisdiction
- Town of Blacksburg
- Size
- 867 kilowatts (1,469 panels)
- Location
- 2800 Commerce Street, Blacksburg, VA 24060, Blacksburg Transit facility
- Applicant
- Town of Blacksburg
- Case number
- Town Ordinance 2102
- Legislation
- Ordinance 2102
- Last checked
- Oct 27, 2026
Timeline
Where it stands.
Every step on record, oldest first, with a link to the public record where there is one.
-
Staff told Council the Town would seek proposals for solar at the Blacksburg Transit facility in late August 2025, with a goal of finishing the installation in December 2026.
-
Ordinance 2102 introduced and public hearing scheduled for December 9, 2025.
-
Council work session review of the power purchase agreement.
-
Town Council adopted Ordinance 2102 unanimously after a public hearing.
-
Town announced that Baseline Solar would soon begin installing 1,469 panels (866.71 kilowatts) on the Blacksburg Transit roof under the 25-year agreement with Secure Solar Futures, with construction scheduled to finish by the end of 2026.
-
Roanoke Times report (republished) said an 867-kilowatt, 1,469-panel system would soon be installed.
-
Town Council held the public hearing on Ordinance 2121, a utility easement to Appalachian Power needed for the rooftop solar installation; the Town Attorney said the project was about halfway done.
Location
On the map.
2800 Commerce Street, Blacksburg, VA 24060, Blacksburg Transit facility. 7 homes are for sale within a mile.
The blue marker is the project. Rings are a half mile and one mile, straight line. Prices are homes for sale now.
Homes for sale nearby
For sale near Blacksburg Transit Facility Rooftop Solar.
The closest homes for sale, within 1.5 miles.
Nearby
Neighborhoods nearby.
Homes for sale, recent sales and prices in each one. Distances are straight-line from the neighborhood’s center.
Sources
From the public record.
- Town of Blacksburg: Town Council work session minutes, August 19, 2025Aug 19, 2025
- Town of Blacksburg: Town Council work session minutes, September 15, 2026Sep 15, 2026
- Town of Blacksburg: Town of Blacksburg Installs 867 kW Solar Power SystemSep 25, 2026
- Town of Blacksburg: Town Council meeting video, October 13, 2026Oct 13, 2026
- Town of Blacksburg: Ordinance 2121 (October 13, 2026 agenda)Oct 13, 2026
- Town of Blacksburg: Town Council meeting minutes, November 12, 2025Nov 12, 2025
- Town of Blacksburg: Town Council work session minutes, November 18, 2025Nov 18, 2025
- Town of Blacksburg: Town Council meeting minutes, December 9, 2025Dec 9, 2025
- Now.Solar (Roanoke Times): Blacksburg Transit facility to get 867-kilowatt solar systemSep 30, 2026
Links go to primary sources only; news reports are listed without a link.
Details can change as a project moves through review. The public record governs. This page was last checked against it on Oct 27, 2026.
From Town of Blacksburg public records. Check the Town's record for decisions.
Alerts
Development news, in your inbox.
Get an email when a Blacksburg project is proposed, goes to a public hearing or is decided. Plain English, with a link to the public record.