CompletedInfrastructure · Heritage Park area, north Blacksburg

Meadowbrook Greenway

New paved trail leading into Heritage Park on the north side of Blacksburg that opened in May 2026, connecting the park to the rest of the town's trail network and to Pandapas Pond. The Town scheduled its ribbon cutting for May 14, 2026. Radio IQ reported that riders can now travel from downtown Blacksburg into the Jefferson National Forest almost entirely on trails separated from car traffic. Length and final cost were not reported; the lower of two construction bids opened in November 2024 was $2,245,028.69.

See the timeline Homes for sale nearby

The project

The details.

The NRV MPO 2050 Constrained Long-Range Transportation Plan lists a Meadowbrook Drive Trail from Heritage Park to Glade Road at an estimated $6,696,000; the sources reviewed do not state whether that line item is the same facility.

Status
Completed
Type
Infrastructure
Jurisdiction
Town of Blacksburg
Location
Heritage Park, Blacksburg, Heritage Park area, north Blacksburg (approximate)
Applicant
Town of Blacksburg
Last checked
Oct 27, 2026

Timeline

Where it stands.

Every step on record, oldest first, with a link to the public record where there is one.

  1. Town opened two bids for the Meadowbrook Drive Greenway Trail Phase I (IFB 1186-24); the lower base bid was $2,245,028.69.

    Public record

  2. Town announced a ribbon cutting to celebrate the opening of the Meadowbrook Greenway, set for May 14, 2026 on the trail in Heritage Park.

    Public record

  3. Radio IQ reported the Meadowbrook Greenway opened in May 2026.

Location

On the map.

Heritage Park, Blacksburg, Heritage Park area, north Blacksburg (approximate location). 2 homes are for sale within a mile.

The blue marker is the project (approximate). Rings are a half mile and one mile, straight line. Prices are homes for sale now.

Homes for sale nearby

For sale near Meadowbrook Greenway.

The closest homes for sale, within 1.5 miles.

Sources

From the public record.

  1. Town of Blacksburg: Bid opening report, IFB 1186-24 Meadowbrook Drive Greenway Trail Phase INov 7, 2024
  2. Town of Blacksburg: Meadowbrook Greenway Ribbon Cutting: May 14May 12, 2026
  3. Radio IQ (WVTF): Blacksburg continues to expand biking trails despite uncertainty over future fundingMay 15, 2026
  4. NRV MPO: 2050 Constrained Long-Range Transportation PlanNov 6, 2025

Links go to primary sources only; news reports are listed without a link.

Details can change as a project moves through review. The public record governs. This page was last checked against it on Oct 27, 2026.

From Town of Blacksburg public records. Check the Town's record for decisions.

Everything coming to Blacksburg

Alerts

Development news, in your inbox.

Get an email when a Blacksburg project is proposed, goes to a public hearing or is decided. Plain English, with a link to the public record.

A local real estate professional will send these updates. Your email is used only for these alerts, and you can stop them anytime by replying to any update.

Questions? Talk to a local real estate professional.Someone who knows Blacksburg will reach out by text, call or email, whichever you prefer. No pressure, no obligation.
Best way to reach you

You'll be connected with a real estate professional ranked in the top 5% in Blacksburg.

We use your details only to reply to you. Privacy