Meadowbrook Greenway
New paved trail leading into Heritage Park on the north side of Blacksburg that opened in May 2026, connecting the park to the rest of the town's trail network and to Pandapas Pond. The Town scheduled its ribbon cutting for May 14, 2026. Radio IQ reported that riders can now travel from downtown Blacksburg into the Jefferson National Forest almost entirely on trails separated from car traffic. Length and final cost were not reported; the lower of two construction bids opened in November 2024 was $2,245,028.69.
The project
The details.
The NRV MPO 2050 Constrained Long-Range Transportation Plan lists a Meadowbrook Drive Trail from Heritage Park to Glade Road at an estimated $6,696,000; the sources reviewed do not state whether that line item is the same facility.
- Status
- Completed
- Type
- Infrastructure
- Jurisdiction
- Town of Blacksburg
- Location
- Heritage Park, Blacksburg, Heritage Park area, north Blacksburg (approximate)
- Applicant
- Town of Blacksburg
- Last checked
- Oct 27, 2026
Timeline
Where it stands.
Every step on record, oldest first, with a link to the public record where there is one.
-
Town opened two bids for the Meadowbrook Drive Greenway Trail Phase I (IFB 1186-24); the lower base bid was $2,245,028.69.
-
Town announced a ribbon cutting to celebrate the opening of the Meadowbrook Greenway, set for May 14, 2026 on the trail in Heritage Park.
-
Radio IQ reported the Meadowbrook Greenway opened in May 2026.
Location
On the map.
Heritage Park, Blacksburg, Heritage Park area, north Blacksburg (approximate location). 2 homes are for sale within a mile.
The blue marker is the project (approximate). Rings are a half mile and one mile, straight line. Prices are homes for sale now.
Homes for sale nearby
For sale near Meadowbrook Greenway.
The closest homes for sale, within 1.5 miles.
Nearby
Neighborhoods nearby.
Homes for sale, recent sales and prices in each one. Distances are straight-line from the neighborhood’s center.
Sources
From the public record.
- Town of Blacksburg: Bid opening report, IFB 1186-24 Meadowbrook Drive Greenway Trail Phase INov 7, 2024
- Town of Blacksburg: Meadowbrook Greenway Ribbon Cutting: May 14May 12, 2026
- Radio IQ (WVTF): Blacksburg continues to expand biking trails despite uncertainty over future fundingMay 15, 2026
- NRV MPO: 2050 Constrained Long-Range Transportation PlanNov 6, 2025
Links go to primary sources only; news reports are listed without a link.
Details can change as a project moves through review. The public record governs. This page was last checked against it on Oct 27, 2026.
From Town of Blacksburg public records. Check the Town's record for decisions.
Alerts
Development news, in your inbox.
Get an email when a Blacksburg project is proposed, goes to a public hearing or is decided. Plain English, with a link to the public record.