Prices Fork Road (Route 412/685) Project Pipeline Study, SA-25-01/SA-25-02

VDOT Project Pipeline planning study of Prices Fork Road from McCoy Road to North Main Street, run with the Town of Blacksburg, Montgomery County and the NRV MPO, focused on roadway and pedestrian safety, bicycle, pedestrian and transit access, and travel demand management. The study ran from March 2025 to August 2026 with public surveys in May and June 2025 (1,440 participants) and December 2025 (730 participants). VDOT says recommendations may become applications for SMART SCALE Round 7 and other funding programs.

See the timeline Homes for sale nearby

The project

The details.

SA-25-01 covers Prices Fork Road (Route 412) from west of the Route 460 Bypass to North Main Street, a 1.40-mile minor arterial with six major intersections, 2023 traffic of 23,800 vehicles per day (Route 460 Bypass to Stanger Street) and 20,100 (Stanger Street to North Main Street), and 239 crashes from 2020 to 2024, including 15 bicycle and 12 pedestrian crashes. SA-25-02 covers Route 412 from McCoy Road (Route 652) to US 460. Phase 2 concepts surveyed in December 2025 included longer left-turn lanes at Heather Drive and Old Glade Road, a median closure at Strock Street/Brightwood Manor Drive, an eastbound bike lane widening at West Campus Drive/Woodland Drive, a restricted crossing U-turn (RCUT) at McBryde Drive, signal and sidewalk changes at Toms Creek Road/Stanger Street, a crosswalk with pedestrian hybrid beacon at Orchard Street, 10-foot sidewalks from Webb Street to Orchard Street, and pedestrian-activated flashing lights at the North Main Street roundabout. At an October 21, 2025 Town Council work session, staff described this study and a concurrent Town study of Toms Creek Road from the US 460 Bypass to Prices Fork Road, said the highest priority area is Prices Fork Road east of the US 460 Bypass, and said both studies would be finalized before the SMART SCALE application in summer 2026. SMART SCALE Round 7 full applications were due August 3, 2026; VDOT reported to the NRV MPO on August 6, 2026 that 294 applications were submitted statewide (36 in the Salem District), with scores expected in January 2027. In March 2026, NRV MPO technical staff noted the MPO did not appear to be submitting projects that round. Whether a Prices Fork Road application was submitted could not be confirmed from public sources. Separately, VDOT project UPC 120697 (Prices Fork/Peppers Ferry Turn Lane Improvements, estimated $8,499,604) is at the far western end of Prices Fork Road (Route 685) where it meets Peppers Ferry Road (Route 114) in Montgomery County; VDOT told the MPO on August 6, 2026 that the contract was awarded and construction runs October 2026 to fall 2027.

Status
Under review
Type
Infrastructure
Jurisdiction
VDOT
Size
1.40 mile study area (SA-25-01 segment)
Location
Prices Fork Road, Prices Fork Road from McCoy Road to North Main Street (SA-25-01: west of the US 460 Bypass to North Main Street) (approximate)
Applicant
VDOT
Case numbers
VDOT Project Pipeline SA-25-01, VDOT Project Pipeline SA-25-02
Last checked
Oct 13, 2026

Timeline

Where it stands.

Every step on record, oldest first, with a link to the official record where there is one.

  1. Phase 1 public survey opened (ran through June 2, 2025; 1,440 participants).

    Official record

  2. Town Council work session on Prices Fork Road transportation planning; staff said both corridor studies would be finalized before the summer 2026 SMART SCALE application.

    Official record

  3. Phase 2 survey on proposed alternatives opened (ran through December 22, 2025; 730 participants).

    Official record

  4. SMART SCALE Round 7 full application deadline.

    Official record

  5. VDOT reported 294 SMART SCALE Round 7 applications statewide, 36 from the Salem District, with scores expected in January 2027.

    Official record

Location

On the map.

Prices Fork Road, Prices Fork Road from McCoy Road to North Main Street (SA-25-01: west of the US 460 Bypass to North Main Street) (approximate location). 13 homes are for sale within a mile.

The blue marker is the project (approximate). Rings are a half mile and one mile, straight line. Prices are homes for sale now.

Homes for sale nearby

For sale near Prices Fork Road Project Pipeline….

The closest homes for sale, within 1.5 miles. Updated every few minutes.

Updated 1 hour ago.

Sources

From the official record.

  1. VDOT Project Pipeline: SA-25-01/SA-25-02 Prices Fork Road (Route 412/685)Apr 14, 2026
  2. VDOT Project Pipeline: SA-25-02 Route 412Mar 24, 2025
  3. VDOT Project Pipeline: SA-25-01 Needs and Existing Conditions Summary (file dated 01-14-2026)Jan 14, 2026
  4. Town of Blacksburg: Town Council work session minutes, October 21, 2025Oct 21, 2025
  5. VDOT: SMART SCALEJun 22, 2026
  6. NRV MPO: TAC meeting notes, March 19, 2026Mar 19, 2026
  7. NRV MPO: Policy Board meeting packet (TIP materials), May 7, 2026May 7, 2026
  8. NRV MPO: Policy Board meeting minutes, August 6, 2026Aug 6, 2026

Details can change as a project moves through review. The official record governs. This page was last checked against it on Oct 13, 2026.

Information from Town of Blacksburg public records and other official sources. Check the official record for decisions. Updated 4 hours ago ().

Everything coming to Blacksburg

Alerts

Development news, in your inbox.

Get an email when a Blacksburg project is proposed, goes to a public hearing or is decided. Plain English, with a link to the official record.

A local real estate professional will send these updates. Your email is used only for these alerts, and you can stop them anytime by replying to any update.