Under constructionUniversity

Mitchell Hall

Virginia Tech is building Mitchell Hall, a five-story College of Engineering building of about 285,500 gross square feet, on the site of the demolished Randolph Hall in the North Academic District near Turner Street. It will be the largest building on the Blacksburg campus and encloses the existing Stability Wind Tunnel. The university's August 2026 capital project status report says the concrete structure is complete and targets completion in winter 2028, with first use in spring 2029.

See the timeline Homes for sale nearby

The project

The details.

Randolph Hall, built in two phases between 1952 and 1959 with 166,000 gross square feet, was demolished in 2024. The new building has over 70 percent more gross square feet than Randolph Hall on the same footprint. Construction Dive reported a total construction cost of $292 million, with an initial $53 million contract signed in May 2024 and a supplemental $240 million contract in June 2025. The Division of Facilities lists Skanska as construction manager and Perkins&Will as architect, with construction starting in spring 2024. Its project page gives 285,500 gross square feet in the description and 296,105 gross square feet in the project data; this entry uses 285,500, the figure also used in the contractor's announcement.

Status
Under construction
Type
University
Jurisdiction
Virginia Tech
Size
About 285,500 gross sq ft, five stories
Location
Virginia Tech campus, North Academic District near Turner Street (former Randolph Hall site)
Applicant
Virginia Tech
Last checked
Oct 27, 2026

Timeline

Where it stands.

Every step on record, oldest first, with a link to the public record where there is one.

  1. Construction Dive reported (publication date) that Skanska and Virginia Tech topped out Mitchell Hall; completion expected winter 2028.

  2. The capital project status report to the board's Facilities and Administration Committee said the concrete structure was complete and interior framing, utilities and exterior masonry were underway, with completion targeted for winter 2028 and first use for spring 2029.

    Public record

Location

On the map.

Virginia Tech campus, North Academic District near Turner Street (former Randolph Hall site). 11 homes are for sale within a mile.

The blue marker is the project. Rings are a half mile and one mile, straight line. Prices are homes for sale now.

Homes for sale nearby

For sale near Mitchell Hall.

The closest homes for sale, within 1.5 miles.

Sources

From the public record.

  1. Virginia Tech Board of Visitors: Facilities and Administration Committee minutes and Capital Project Status Report, Aug. 25, 2026 (Attachment I)Aug 25, 2026
  2. Virginia Tech Division of Facilities: Mitchell Hall (Randolph Hall Replacement) project page (undated; accessed)Oct 13, 2026
  3. Construction Dive: Skanska tops out Virginia Tech facility Mitchell HallJul 9, 2026

Links go to primary sources only; news reports are listed without a link.

Details can change as a project moves through review. The public record governs. This page was last checked against it on Oct 27, 2026.

From Town of Blacksburg public records. Check the Town's record for decisions.

Everything coming to Blacksburg

Alerts

Development news, in your inbox.

Get an email when a Blacksburg project is proposed, goes to a public hearing or is decided. Plain English, with a link to the public record.

A local real estate professional will send these updates. Your email is used only for these alerts, and you can stop them anytime by replying to any update.

Questions? Talk to a local real estate professional.Someone who knows Blacksburg will reach out by text, call or email, whichever you prefer. No pressure, no obligation.
Best way to reach you

You'll be connected with a real estate professional ranked in the top 5% in Blacksburg.

We use your details only to reply to you. Privacy